Análise comparativa dos métodos de lavra subterrânea de câmaras e pilares e longwall: estudo de caso em uma mina de ouro na Colômbia

dc.contributor.advisorSantos, Allan Erlikhman Medeiros
dc.contributor.advisor-coSeer, Hildor José
dc.contributor.advisor-coLatteshttp://lattes.cnpq.br/4835931153715441
dc.contributor.advisorLatteshttp://lattes.cnpq.br/9094462711635728
dc.contributor.authorCifuentes Salazar, Manuel Esteban
dc.contributor.authorLatteshttp://lattes.cnpq.br/1865045244059014
dc.contributor.refereeSantos, Allan Erlikhman Medeiros
dc.contributor.refereeSeer, Hildor José
dc.contributor.refereeSilveira, Larissa Regina Costa
dc.contributor.refereeMendonça, Guilherme Alzamora
dc.date.accessioned2026-10-09T12:55:32Z
dc.date.available2026-10-09T12:55:32Z
dc.date.issued2024-11-07
dc.description.abstractA mineração subterrânea de ouro é uma atividade econômica que enfrenta vários desafios técnicos e operacionais. Este trabalho analisa a possibilidade de substituir o método de explotação de câmaras e pilares tradicionalmente utilizado em uma mina de ouro subterrânea pelo método longwall, buscando aumentar o volume de produção em 10 %. Um dos parâmetros mais críticos abordados durante o desenvolvimento deste estudo é o controle da diluição, pois a falta dele afeta a rentabilidade e a eficiência das operações, desempenhando assim um papel estratégico na implementação do método. Para comprovar a viabilidade dessa proposta, foi realizada uma avaliação econômica dos custos operacionais, desde a perfuração, passando pelo transporte primário do minério até chegar no ponto final. Além disso, foi elaborado um protocolo para o cálculo da diluição, definindo a altura dos cortes de produção e as diretrizes a serem seguidas para realizar as medições necessárias no desenvolvimento do projeto. Manteve-se um controle do consumo dos materiais utilizados em todo o processo para contrastar os valores teóricos e práticos, a fim de determinar os custos unitários de produção para cada um dos métodos. Os resultados indicam um aumento na eficiência operacional e na rentabilidade com a implementação do novo método. A diluição não planejada no painel piloto explotado pelo método longwall foi, aproximadamente, 40 % mais baixa que a diluição não planejada contrastada com o método câmaras e pilares. E, em relação aos custos por tonelada de minério extraída, o método longwall foi 38 % mais econômico que o método de explotação tradicionalmente utilizado. Além de propostas práticas para otimizar a produção, destaca-se a importância do controle da diluição na metodologia adotada, o qual oferece base para avaliar a viabilidade técnica e econômica da implementação do método longwall.
dc.description.abstractotherUnderground gold mining is an economic activity that faces several technical and operational challenges. This study analyzes the possibility of replacing the traditional room-and-pillar mining method used in an underground gold mine with the longwall method, aiming to increase the production volume by 10 %. One of the critical parameters addressed during the development of this study is dilution control, as its absence affects profitability and operational efficiency, playing a strategic role in method implementation. To prove the feasibility of this proposal, an economic evaluation of operational costs was determined, from drilling through primary ore transportation to the gates. Additionally, a protocol for dilution calculation was developed, defining the height of production cuts and guidelines to be followed for conducting necessary measurements in dissertation development. Material consumption throughout the process was maintained to contrast theoretical and practical values, to determine unit production costs for each of the methods. The results indicate an increase in operational efficiency and profitability with the implementation of the new method. Unplanned dilution in the pilot panel exploited using the longwall method was approximately 40 % lower compared to that observed with the room and pillars method. Furthermore, in terms of costs per tonnes of extracted ore, the longwall method proved to be 38 % more economical than the traditionally used exploitation method. In addition to practical proposals to optimize production, the importance of dilution control in the adopted methodology is highlighted, offering a solid foundation for evaluating the technical and economic feasibility of longwall method implementation.
dc.identifier.urihttps://repositorio.cefetmg.br//handle/123456789/3125
dc.language.isopt
dc.publisherCentro Federal de Educação Tecnológica de Minas Gerais
dc.publisher.countryBrasil
dc.publisher.initialsCEFET-MG
dc.publisher.programPrograma de Pós-Graduação em Engenharia de Minas
dc.subjectMinas e mineração – Processos
dc.subjectLavra de minas
dc.subjectLavra subterrânea
dc.titleAnálise comparativa dos métodos de lavra subterrânea de câmaras e pilares e longwall: estudo de caso em uma mina de ouro na Colômbia
dc.typeDissertação

Arquivos

Pacote Original
Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
Análise comparativa dos métodos de lavra subterrânea de câmaras e pilares e longwall.pdf
Tamanho:
9.66 MB
Formato:
Adobe Portable Document Format
Licença do Pacote
Agora exibindo 1 - 1 de 1
Nenhuma Miniatura disponível
Nome:
license.txt
Tamanho:
1.39 KB
Formato:
Item-specific license agreed to upon submission
Descrição: