Análise integrada de planejamento e orçamentação em obras de movimentação de terra: impacto das chuvas na viabilidade técnico-econômica
| dc.contributor.advisor | Padula, Flávio Renato de Góes | |
| dc.contributor.advisorLattes | http://lattes.cnpq.br/4801461064304302 | |
| dc.contributor.author | Lopes, Ciro Henrique Machado Ribeiro | |
| dc.contributor.referee | Padula, Flávio Renato de Góes | |
| dc.contributor.referee | Martins, Cláudio José | |
| dc.contributor.referee | Oliveira, Eduardo de | |
| dc.date.accessioned | 2026-10-09T22:48:48Z | |
| dc.date.available | 2026-10-09T22:48:48Z | |
| dc.date.issued | 2026-07-03 | |
| dc.description.abstract | As obras de terraplenagem são particularmente sensíveis às condições climáticas, uma vez que a ocorrência de chuvas pode comprometer a escavação, o transporte e a compactação dos solos, reduzindo a disponibilidade de horas produtivas e ampliando os custos de execução. Diante disso, este trabalho teve como objetivo analisar a influência da sazonalidade pluviométrica no planejamento e na orçamentação de uma obra hipotética de movimentação de terra, avaliando seus impactos sobre o prazo e o custo total do empreendimento. A pesquisa foi desenvolvida por meio de uma abordagem quantitativo-descritiva, com base em dados históricos de precipitação registrados em Belo Horizonte, Minas Gerais, entre 2015 e 2024. Os eventos de chuva foram classificados conforme o volume diário precipitado e convertidos em períodos de paralisação por meio da aplicação de fatores de retomada. A partir desses parâmetros, foram calculadas as horas produtivas médias mensais e elaborados dois cronogramas de execução, considerando os mesmos quantitativos, equipamentos, mão de obra e produtividades, mas com datas de início distintas: junho, durante o período predominantemente seco, e novembro, no início da estação chuvosa. No cenário iniciado em junho, a obra apresentou duração de 81 dias corridos, equivalentes a 2,60 meses, e custo total estimado em R$ 850.720,00. No cenário iniciado em novembro, a duração aumentou para 140 dias corridos, equivalentes a 4,6 meses, elevando o custo total para R$ 1.505.120,00. A diferença de R$ 654.400,00 representa um acréscimo aproximado de 76,92% no custo do empreendimento. Os resultados demonstram que a desconsideração da sazonalidade climática pode provocar subestimações relevantes de prazo e orçamento, comprometendo a viabilidade técnico-econômica das obras. Conclui-se que a incorporação de dados pluviométricos históricos e fatores de retomada constitui uma ferramenta acessível e eficaz para aprimorar o planejamento de serviços de terraplenagem. | |
| dc.description.abstractother | Earthworks are particularly sensitive to weather conditions, since rainfall can affect soil excavation, transportation, and compaction activities, reducing the availability of productive working hours and increasing execution costs. Therefore, this study aimed to analyze the influence of rainfall seasonality on the planning and budgeting of a hypothetical earthmoving project, assessing its impacts on the project schedule and total cost. The research was developed through a quantitative-descriptive approach based on historical rainfall data recorded in Belo Horizonte, Minas Gerais, between 2015 and 2024. Rainfall events were classified according to the daily precipitation volume and converted into downtime periods through the application of recovery factors. Based on these parameters, the average monthly productive hours were calculated, and two execution schedules were prepared considering the same quantities, equipment, workforce, and productivity rates, but with different starting dates: June, during the predominantly dry season, and November, at the beginning of the rainy season. In the scenario starting in June, the project had a duration of 81 calendar days, equivalent to 2.6 months, and an estimated total cost of BRL 850.720.00. In the scenario starting in November, the duration increased to 140 calendar days, equivalent to 4.60 months, raising the total cost to BRL 1,505,120.00. The difference of BRL 654,400.00 represents an approximate 76.92% increase in the project cost. The results demonstrate that disregarding rainfall seasonality may lead to significant underestimations of schedule and budget, compromising the technical and economic feasibility of earthworks. It is concluded that incorporating historical rainfall data and recovery factors is an accessible and effective tool for improving the planning of earthmoving activities. | |
| dc.identifier.uri | https://repositorio.cefetmg.br//handle/123456789/3129 | |
| dc.language.iso | pt | |
| dc.publisher | Centro Federal de Educação Tecnológica de Minas Gerais | |
| dc.publisher.country | Brasil | |
| dc.publisher.department | Departamento de Engenharia Civil | |
| dc.publisher.initials | CEFET-MG | |
| dc.subject | Indústria da construção civil – Administração | |
| dc.subject | Produção enxuta | |
| dc.subject | Engenharia geotécnica | |
| dc.subject | Planejamento da produção | |
| dc.subject | Controle de produção | |
| dc.title | Análise integrada de planejamento e orçamentação em obras de movimentação de terra: impacto das chuvas na viabilidade técnico-econômica | |
| dc.type | Trabalho de Conclusão de Curso da Graduação |
Arquivos
Pacote Original
1 - 1 de 1
Carregando...
- Nome:
- Análise integrada de planejamento e orçamentação em obras de movimentação de terra.pdf
- Tamanho:
- 1.19 MB
- Formato:
- Adobe Portable Document Format
Licença do Pacote
1 - 1 de 1
Nenhuma Miniatura disponível
- Nome:
- license.txt
- Tamanho:
- 1.39 KB
- Formato:
- Item-specific license agreed to upon submission
- Descrição: