Revisão sistemática da literatura sobre metodologias de planejamento aplicadas à construção civil pesada: benefícios, barreiras e aplicações por tipo de obra

dc.contributor.advisorAzevedo, Rogério Cabral de
dc.contributor.advisorLatteshttp://lattes.cnpq.br/0613519736951060
dc.contributor.authorMendes, Eduardo Cesar Reis Braga
dc.contributor.refereeAzevedo, Rogério Cabral de
dc.contributor.refereePoggiali, Flávia Spitale Jacques
dc.contributor.refereeMagalhães, Luciana Nunes de
dc.date.accessioned2026-09-08T16:52:08Z
dc.date.available2026-09-08T16:52:08Z
dc.date.issued2026-06-16
dc.description.abstractA indústria da construção civil pesada e o desenvolvimento de grandes projetos de infraestrutura é caracterizada pela elevada complexidade técnica, longa duração, capital e riscos operacionais. Diante disso, esta pesquisa visa analisar técnicas do planejamento aplicadas à construção civil pesada, com o foco em suas aplicações, benefícios, barreiras e relações com diferentes tipologias de obra. O estudo adota o método Systematic Review for Engineering and Experiments (SR2E) para conduzir uma revisão sistemática da literatura científica publicada entre 2013 e 2023. Os resultados indicam limitações do uso isolado de cronogramas determinísticos e apontam uma transição para abordagens mais dinâmicas, visando a colaborativas. Destaca-se o Lean Construction, especialmente o Last Planner System, na estabilização do fluxo de trabalho, e a Modelagem da Informação da Construção (BIM 4D/5D), na integração entre planejamento, custos e coordenação espacial. A literatura também evidencia barreiras relacionadas à fragmentação da cadeia de suprimentos, à baixa maturidade digital e aos modelos contratuais tradicionais. Além disso, os resultados mostram que a efetividade das metodologias depende da tipologia da obra e do contexto organizacional de aplicação. Conclui-se que a melhoria de desempenho na construção pesada não depende da adoção isolada de ferramentas tecnológicas, mas da integração entre métodos de planejamento, gestão colaborativa, qualidade dos dados e características específicas do empreendimento.
dc.description.abstractotherThe heavy civil construction industry and the development of large infrastructure projects and megaprojects are characterized by high technical complexity, long project durations, capital-intensive operations, and multiple operational uncertainties. In this context, this research aims to analyze contemporary planning methodologies applied to heavy civil construction, seeking to critically synthesize their applications, benefits, barriers, and relationships with different project typologies. The study adopts the Systematic Review for Engineering and Experiments (SREE) method to conduct a systematic review of the scientific literature published between 2015 and 2026. The results indicate limitations in the isolated use of deterministic scheduling methods and point to a transition toward more dynamic, visual, and collaborative approaches. Lean Construction, especially the Last Planner System, stands out for improving workflow stability, while Building Information Modeling (BIM 4D/5D) contributes to the integration of planning, cost management, and spatial coordination. The literature also highlights barriers related to supply chain fragmentation, low digital maturity, and traditional contractual models. Furthermore, the findings demonstrate that the effectiveness of planning methodologies depends on the project typology and the organizational context in which they are applied. It is concluded that improving performance in heavy civil construction does not depend on the isolated adoption of technological tools, but rather on the integration of planning methods, collaborative management practices, data quality, and the specific characteristics of each project.
dc.identifier.urihttps://repositorio.cefetmg.br//handle/123456789/2950
dc.language.isopt
dc.publisherCentro Federal de Educação Tecnológica de Minas Gerais
dc.publisher.countryBrasil
dc.publisher.departmentDepartamento de Engenharia Civil
dc.publisher.initialsCEFET-MG
dc.subjectIndústria da construção – Administração – Teses
dc.subjectProdução enxuta – Teses
dc.subjectProjeto de construção – Gerenciamento – Teses
dc.subjectModelagem de informação da construção – Teses.
dc.subjectConstrução civil – Planejamento – Teses
dc.titleRevisão sistemática da literatura sobre metodologias de planejamento aplicadas à construção civil pesada: benefícios, barreiras e aplicações por tipo de obra
dc.typeTrabalho de Conclusão de Curso da Graduação

Arquivos

Pacote Original
Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
Revisão sistemática da literatura sobre metodologias de planejamento aplicadas à construção civil pesada benefícios, barreiras e aplicações por tipo de obra.pdf
Tamanho:
39.77 MB
Formato:
Adobe Portable Document Format
Licença do Pacote
Agora exibindo 1 - 1 de 1
Nenhuma Miniatura disponível
Nome:
license.txt
Tamanho:
1.39 KB
Formato:
Item-specific license agreed to upon submission
Descrição: