Otimização da programação integrada de curto prazo na mineração

dc.contributor.advisorMenezes, Gustavo Campos
dc.contributor.advisorLatteshttp://lattes.cnpq.br/6903109160065321
dc.contributor.authorCorrêa, Juliano dos Santos
dc.contributor.authorLatteshttp://lattes.cnpq.br/5151130536965820
dc.contributor.refereeMenezes, Gustavo Campos
dc.contributor.refereeSarubbi, Fernando Machry
dc.contributor.refereeSouza, Sérgio Ricardo de
dc.contributor.refereeSouza, Marcone Jamilson Freitas
dc.date.accessioned2025-04-11T12:41:02Z
dc.date.available2025-04-11T12:41:02Z
dc.date.issued2020-11-27
dc.description.abstractA extração mineral é uma atividade de grande fonte de renda, auxiliando financeira e economicamente, e no Brasil, essa contribuição da extração mineral é muito relevante devido às escalas globais dos ativos minerários existentes em solo. As grandes mineradoras no Brasil possuem múltiplos ativos produtivos e logísticos, sendo necessário um planejamento integrado de forma a otimizar a utilização desses ativos objetivando o atendimento das demandas dos clientes por minério e a redução dos custos operacionais. Neste contexto, é definido o problema de programação integrada de curto prazo em minas, no qual as decisões de nível tático são definidas conjuntamente nos centros de operações integradas (COI). Este problema é resolvido utilizando programação inteira mista, Relax and Fix, Fix and Optimize e Local Branching. Além disso, uma metodologia de testes e avaliação é proposto (tanto da verificação dos algoritmos como da validação do problema) e os resultados obtidos são comparados.
dc.description.abstractotherMineral extraction is an activity of great source of income, contributing financially and economically, and in Brazil, this contribution is very relevant due to the global scales of the mining assets existing in the soil. Large mining companies in Brazil have multiple productive and logistical assets, requiring integrated planning in order to optimize the use of these assets in order to meet customer demands for ore and reduce operating costs. In this context, the problem of integrated short-term programming in mines is defined, in which decisions at the tactical level are defined jointly in integrated operations centers (IOC). This problem is solved using mixed integer programming, Relax and Fix, Fix and Optimize and Local Branching. In addition, a testing and evaluation methodology is proposed (both for checking the algorithms and validating the problem) and the results obtained are compared.
dc.identifier.urihttps://repositorio.cefetmg.br//handle/123456789/1170
dc.language.isopt
dc.publisherCentro Federal de Educação Tecnológica de Minas Gerais
dc.publisher.countryBrasil
dc.publisher.initialsCEFET-MG
dc.publisher.programPrograma de Pós-Graduação em Modelagem Matemática e Computacional
dc.subjectMineração de dados
dc.subjectProgramação matemática
dc.subjectOtimização matemática
dc.titleOtimização da programação integrada de curto prazo na mineração
dc.typeDissertação

Arquivos

Pacote Original
Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
Otimização da programação integrada de curto prazo na mineração.pdf
Tamanho:
3.34 MB
Formato:
Adobe Portable Document Format
Licença do Pacote
Agora exibindo 1 - 1 de 1
Nenhuma Miniatura disponível
Nome:
license.txt
Tamanho:
1.39 KB
Formato:
Item-specific license agreed to upon submission
Descrição: