Controle tecnológico em obras de terraplenagem: estudo de caso aplicado à barragem de mineração
| dc.contributor.advisor | Urashima, Denise de Carvalho | |
| dc.contributor.advisorLattes | http://lattes.cnpq.br/9870039269278664 | |
| dc.contributor.author | Caixeta, Fernanda Vieira Borges | |
| dc.contributor.authorLattes | http://lattes.cnpq.br/6109977430679224 | |
| dc.contributor.referee | Urashima, Denise de Carvalho | |
| dc.contributor.referee | Cândido, Eduardo Souza | |
| dc.contributor.referee | Ferreira, Lucas Deleon | |
| dc.contributor.referee | Guia, Luiz Pinheiro da | |
| dc.date.accessioned | 2026-10-14T15:42:12Z | |
| dc.date.available | 2026-10-14T15:42:12Z | |
| dc.date.issued | 2023-11-27 | |
| dc.description.abstract | O controle tecnológico, frequentemente utilizado na gestão da qualidade para obras da construção civil com foco no atendimento aos procedimentos normativos, são utilizados para garantir a rastreabilidade das informações ao longo de todo período construtivo com o objetivo de determinar as causas e responsabilidades por falhas e posteriormente, evidenciar as tratativas com atendimento aos requisitos estabelecidos em projeto. Comumente, as obras de terras eram executadas de forma a seguir os procedimentos normativos em relação aos ensaios de solos, porém se limitava a estes registros, sem retroalimentação das informações do projeto na elaboração de como construído e, com o acervo das informações mantida de modo temporário. As adequações referentes ao controle tecnológico e rastreabilidade das informações para as obras de terra foram implementadas, principalmente para as obras de terra destinadas a área de mineração para contenção de rejeitos, em virtude do atendimento de legislações e exigências estabelecidas na Política Nacional de Segurança em Barragens (PNSB), onde por meio de um dos seus instrumentos, o Plano de Segurança da Barragem (PSB), estabelece a periodicidade de execução ou atualização, qualificação dos responsáveis técnicos, conteúdo mínimo e o nível de detalhamento. A pesquisa teve como objetivo principal apresentar os controles tecnológicos desenvolvidos para um estudo de caso de obra de adequação da metodologia construtiva de uma barragem de mineração a fim de garantir a qualidade executiva da estrutura, rastreabilidade e confiabilidade dos dados, perante os procedimentos normativos e especificações técnicas. A metodologia aplicada foi a implementação de fichas de verificação das etapas construtivas, vinculados aos ensaios de liberação junto a evidência fotográfica e posteriormente, compilados com uma capa resumo e vinculados no modelo, através do hyperlink, Building Information Modeling (BIM), plataforma de gerenciamento das informações que possibilita a visualização dos dados estruturados e multidisciplinares em três dimensões de modo ágil e interativo. Os resultados obtidos foram controles assertivos, evidência e validação de todas as partes envolvidas na execução das atividades realizadas no aterro, elementos drenantes (filtro vertical e tapete horizontal), drenagens superficiais e alterações de projeto. Conclui-se que os controles desenvolvidos e compilados no BIM são promissores para assegurar a rastreabilidade e confiabilidade das informações de maneira célere, visto que os metadados estão disponíveis em três dimensões (3D) de forma a facilitar a visualização dos resultados. Palavras-chave: mineração; barragem; controle tecnológico; qualidade; legislação; BIM. | |
| dc.description.abstractother | Technological control, frequently used in quality management for civil construction works with a focus on compliance with regulatory procedures, is used to ensure the traceability of information throughout the entire construction period with the aim of determining the causes and responsibilities for failures and subsequently, highlight the negotiations that meet the requirements established in the project. Commonly, land works were carried out in order to follow the normative procedures in relation to soil tests, but it was limited to these records, without feedback of project information in the preparation of as built and, with the collection of information maintained in a temporary. The adjustments relating to technological control and traceability of information for earthworks were implemented, mainly for earthworks intended for the mining area to contain tailings, due to compliance with legislation and requirements established in the National Dam Safety Policy (PNSB), where through one of its instruments, the Dam Safety Plan (PSB), establishes the periodicity of execution or updating, qualification of those responsible, minimum content and level of detail. The main objective of the research was to present the technological controls developed for a case study of work to adapt the construction methodology of a mining dam in order to guarantee the executive quality of the structure, traceability and reliability of data, in light of regulatory procedures and specifications. techniques. The methodology applied was the implementation of verification sheets for the construction stages, linked to the release tests together with photographic evidence and later, compiled with a summary cover and linked to the model, through the hyperlink, Building Information Modeling (BIM), a management platform information system that enables the visualization of structured and multidisciplinary data in three dimensions in an agile and interactive way. The results obtained were assertive controls, evidence and validation of all parties involved in the execution of activities carried out at the landfill, drainage elements (vertical filter and horizontal mat), surface drainage and design changes. It is concluded that the controls developed and compiled in BIM are promising for ensuring the traceability and reliability of information quickly, as the metadata is available in three dimensions (3D) in order to facilitate the visualization of the results. Key-words: mining; dam; technological control; quality; legislation; BIM. | |
| dc.identifier.uri | https://repositorio.cefetmg.br//handle/123456789/3134 | |
| dc.language.iso | pt | |
| dc.publisher | Centro Federal de Educação Tecnológica de Minas Gerais | |
| dc.publisher.country | Brasil | |
| dc.publisher.department | Departamento de Minas e Construção Civil | |
| dc.publisher.initials | CEFET-MG | |
| dc.publisher.program | Programa de Pós-Graduação em Engenharia de Minas | |
| dc.subject | Minas e mineração - Controle | |
| dc.subject | Barragens de rejeitos | |
| dc.subject | Terraplenagem | |
| dc.title | Controle tecnológico em obras de terraplenagem: estudo de caso aplicado à barragem de mineração | |
| dc.type | Dissertação |
Arquivos
Pacote Original
1 - 1 de 1
Carregando...
- Nome:
- Controle tecnológico em obras de terraplenagem estudo de caso aplicado à barragem de mineração.pdf
- Tamanho:
- 3.78 MB
- Formato:
- Adobe Portable Document Format
Licença do Pacote
1 - 1 de 1
Nenhuma Miniatura disponível
- Nome:
- license.txt
- Tamanho:
- 1.39 KB
- Formato:
- Item-specific license agreed to upon submission
- Descrição: