Gestão de facilidades em tempo real: integração da visão computacional ao BIM
dc.contributor.advisor | Carvalho, Maria Cristina Ramos de | |
dc.contributor.advisor-co | Pádua, Flávio Luis Cardeal | |
dc.contributor.advisor-coLattes | http://lattes.cnpq.br/6545115051079964 | |
dc.contributor.advisorLattes | http://lattes.cnpq.br/3175194904738511 | |
dc.contributor.author | Matos, Nelson Rafael Muñoz | |
dc.contributor.referee1 | Carvalho, Maria Cristina Ramos de | |
dc.contributor.referee2 | Pádua, Flávio Luis Cardeal | |
dc.contributor.referee3 | Oliveira, Danielle Meireles de | |
dc.contributor.referee4 | Santos, Flávio Antônio dos | |
dc.date.accessioned | 2023-06-06T14:27:41Z | |
dc.date.available | 2023-06-06T14:27:41Z | |
dc.date.issued | 2018-07-09 | |
dc.description.abstract | A indústria da construção sofre de baixa produtividade, refletindo um atendimento deficiente das necessidades de desenvolvimento da infraestrutura da qual o país precisa para o crescimento económico. Estudos tem concluído que se precisa da inovação tecnológica como uma das bases fundamentais para o aumento do crescimento sustentável e da produtividade. A utilização do Building Information Modeling (BIM) na indústria da construção tem surgido como uma ferramenta para dar resposta a esta necessidade de inovação tecnológica, informatizando integralmente o processo de construção assim como todo o clico de vida das construções. Outra tecnologia que tem demonstrado grande sucesso é a Visão Computacional (VC) aplicada ao BIM para refletir digitalmente e em tempo real o andamento e estado das construções. A Gestão de Facilidades (GF) representa um elemento crucial da indústria que, até o momento, não teve a aplicação destas duas tecnologias conjuntamente, como têm sido aplicadas em outras áreas da indústria. Este trabalho tem como objetivo estudar a viabilidade da integração da VC com o BIM para captação, processamento e visualização de dados para facilitar as operações e a tomada de decisões em tempo real de diversas áreas da GF. Isto é atingido através do levantamento de dados sobre as diversas técnicas de VC que podem ser aplicadas junto ao BIM na GF. As fontes da pesquisa baseiam-se na revisão da literatura, assim como reportes de inspeção e a realização de entrevistas com profissionais da área. Os dados coletados são posteriormente classificados e mapeados graficamente em uma estrutura conceitual coerente, e a estrutura resultante validada novamente com profissionais da indústria. Os dados estruturados e validados são utilizados para produzir um arcabouço conceitual e aplicado na criação de um protótipo do sistema proposto, o qual foi implementado para verificar a sua viabilidade. Embora tenham sido detectados desafios que poderiam dificultar o uso do sistema devido ao estado atual das tecnologias disponíveis comercialmente até o momento, comprova-se a tecnologia desenvolvida como uma alternativa viável para facilitar uma GF mais eficiente. Isso porque reaproveita as câmeras de segurança sem acrescentar sensores nem o incremento de custo tipicamente associados aos sistemas de captação e sensoriamento de dados tradicionais. | |
dc.description.abstractother | The construction industry is currently suffering from low productivity, resulting a deficiency to service basic infrastructure development, of which the country relies upon for economic growth. Studies have found that technologic innovation is needed as one of the basic cornerstones for sustainable growth and productivity. The use of Building Information Modeling (BIM) in the construction industry has emerged as one of the main tools for responding to this technologic innovation need, bringing the construction process as well as the whole building live-cycle into the age of integrated information. Another technology that has shown great success is Computer Vision (CV) applied to BIM in order to digitally reproduce in real-time the construction progress and state. Facilities Management (FM) represents a crucial element of the industry that has not seen the application of these two technologies in conjunction in the same way they have been applied in other industry segments. This work has the objective of studying the viability of integrating VC with BIM for capturing, processing and visualizing data to facilitate the operation and decision-making processes of FM. This is achieved through data gathering about various CV techniques that can be used in conjunction with BIM for FM. The data gathering consists of researching existing academic literature, as well as inspection reports and conducting interviews with industry professionals. The collected data is subsequently classified and graphically mapped in a coherent conceptual structure, and this resulting structure is validated once more with industry experts. This validated structure is used to produce a conceptual framework and it is applied to the creation of a prototype of the proposed system which was implemented to validate its viability. Although several challenges were detected that could difficult the use of the system, due to the state of current commercially available technologies, it has been proven that the developed technology is a viable alternative to facilitate a more efficient FM, which at the same time reuses security cameras without the addition of sensors or the increase in costs typically associated with traditional data gathering and sensing systems. | |
dc.identifier.uri | https://repositorio.cefetmg.br/handle/123456789/223 | |
dc.language.iso | pt | |
dc.publisher | Centro Federal de Educação Tecnológica de Minas Gerais | |
dc.publisher.country | Brasil | |
dc.publisher.initials | CEFET-MG | |
dc.publisher.program | Programa de Pós-Graduação em Engenharia Civil | |
dc.subject | Gestão de instalações | |
dc.subject | Modelagem de informação da construção | |
dc.subject | Visão por computador | |
dc.subject | Controle em tempo real - Administração | |
dc.subject | Gerenciamento de projetos | |
dc.title | Gestão de facilidades em tempo real: integração da visão computacional ao BIM | |
dc.type | Dissertação | |
dspace.entity.type |
Arquivos
Pacote Original
1 - 1 de 1
Carregando...
- Nome:
- Gestão de facilidades em tempo real.pdf
- Tamanho:
- 6.41 MB
- Formato:
- Adobe Portable Document Format
Licença do Pacote
1 - 1 de 1
Nenhuma Miniatura disponível
- Nome:
- license.txt
- Tamanho:
- 1.71 KB
- Formato:
- Item-specific license agreed to upon submission
- Descrição: